• <table id="g0eeg"><source id="g0eeg"></source></table>
    <table id="g0eeg"></table>
  • <table id="g0eeg"><option id="g0eeg"></option></table>
  • AMECO Beijing A380 Hangar
    FontSize:【L??M S
    Profile:

    Dimension: (176m+176m)×110m×30m (span, in-depth, lower chord height)
    Maintenance Level: Line Maintenance
    Floor Area: 64,285 sqm
    Plot Area: 50,500 sqm
    Completion Date: Y 2008
    Notes of Interest: 
    The largest maintenance hangar of the world.
    Project for Beijing Olympic Games 2008.
    The 9th Tien-Yow Jeme Civil Engineering Prize.
    Space frame height 8m only.
    Accommodating six (6) A380/B737-400 + four (4) NB aircraf 

  • <table id="g0eeg"><source id="g0eeg"></source></table>
    <table id="g0eeg"></table>
  • <table id="g0eeg"><option id="g0eeg"></option></table>
  • 人人视频